Uralsk, West Kazakhstan Region
BJ-URAL Request a proposal

A full range of cementing services for reliable zonal isolation and long-term well integrity.

Select a service line, then press an item for details.

Casing cementing from surface to production strings, with slurry design and placement engineered for each section.

  • Surface, intermediate, and production casing

    Cementing of each casing string to support the casing, protect it from corrosion, and isolate the formations behind it.

  • Optimized slurry design (lead/tail systems)

    Lead and tail slurries with density, thickening time, and strength matched to well temperature, pressure, and fracture gradient.

  • Efficient displacement and placement

    Spacers, pump rates, and centralization planned to remove drilling fluid and place cement around the full circumference of the casing.

  • Stage cementing and plug systems

    Stage tools and wiper plugs for long intervals and weak formations that cannot hold a full cement column in a single stage.

Discuss a well program

Corrective cementing to restore isolation, cure losses, and secure or abandon wellbores.

  • Squeeze cementing (packer / packerless)

    Cement placed under pressure into perforations, channels, or casing leaks, with or without a packer, to restore isolation.

  • Loss circulation treatments

    Cement and lost-circulation systems placed across thief zones to stop fluid losses and allow operations to continue.

  • Leak sealing and zonal isolation repair

    Repair of casing leaks and failed primary cement to re-establish the barrier between zones.

  • Plug setting and well abandonment

    Cement plugs for sidetracking, zone isolation, and temporary or permanent well abandonment.

Discuss a well program

Cementing solutions for wells where long-term barrier performance is hardest to achieve.

  • Gas migration control

    Slurry design and placement practices that limit gas entry into the cement column while it sets.

  • HPHT and complex well conditions

    Cement systems designed and tested for high pressure, high temperature, and narrow pressure margins.

  • Horizontal and deviated wells

    Centralization, fluid design, and displacement planned for cement coverage in high-angle and horizontal sections.

  • Sustained casing pressure (SCP) mitigation

    Cementing solutions to prevent and remediate pressure build-up in the annulus between casing strings.

Discuss a well program

Modern equipment, downhole tools, and experienced crews for efficient, reliable operations.

  • Modern cementing units and blending systems

    Units and blending systems that mix and pump slurry at the designed density and rate.

  • Cementing tools and downhole equipment (float equipment, plugs, stage tools)

    Float shoes and collars, wiper plugs, and stage tools selected for each casing program.

  • Centralizers (bow-spring and rigid types)

    Centralizer type and spacing chosen to keep casing off the wellbore wall for a uniform cement sheath.

  • Bulk handling and storage systems

    Storage and transfer of dry cement and additives on location.

  • Real-time job monitoring and control

    Pressure, rate, and density recorded and monitored throughout the job.

  • Experienced field crews and supervisors

    Crews and supervisors who run the job on location, from rig-up to completion.

Discuss a well program

Schematic of a cemented well with the selected service highlighted Surface casing Intermediate casing Lead slurry Production casing Tail slurry Top plug Squeeze cementing Loss zone treatment Cement plug SCP mitigation Gas migration control HPHT conditions Cementing unit Cement head Centralizers Float collar Float shoe
Simplified well schematic, not to scale.

Equipment

Modern cementing equipment on location.

BJ-URAL cementing unit with mixing tanks on a well site
BJ-URAL cementing unit on location.
Bulk cement trailer and storage silos
Bulk handling and storage systems.

Planning a cementing job?

Send us the well details and our team will prepare a proposal.